The project's intention
To build a facility for the ecological transformation of mixed municipal solid waste and similar types of waste with a capacity of up to 100 kilotons/year on the territory of a brownfield for production of recycled materials and subsequent materials or energy recovery.
Location
Czech Republic - Horní Benešov
- Territory of the landfill in Horní Benešov
- Available area: 55.000 sq. metre
- The territory without protection limits and current ecological burden
State of preparation of the territory
- Surface modifications in progress
- Approved zoning plan for material and energy recovery of waste
- Preparation of a project for installation of a photovoltaic power plant on adjacent land
Technical infrastructure
- Power lines 22kV at the base of the property
- High-voltage substation in Horní Životice up to 2,17 mi
- High-pressure natural gas pipeline up to 1,55 mi
- Silesian Harta water reservoir (volume 286 mio cu yd) up to 2,8 mi
Accessibility
- Road I/11 in the immediate vicinity
- New city bypass completed
- Regional cities of Ostrava, Olomouc up to 37 mi